Quarry Conveyor
We were recently engaged by Lifterz Crane Hire from Plymouth to help in the relocation of a Grader and Conveyor system from a Quarry site in St Austell to Moorcroft Quarry in Plymstock. The job involved the loading of large and bulky structural steel components utilising a low loader to aid in height reduction. The load was still 3.2m wide and the travelling height was 4.9m both necessitating additional Abnormal Load and Tamar Bridge Permits. Health and Safety was a key issue on this move and all Quarry rules had to be adhered to. The job was completed successfully and we’re looking forward to stage 2 in due course.